Project WB5
Name of project Project WB5

Number 01

Building location Hong Ngu district - Dong Thap Province

Mission :

Scope of works 
- Bridge Superstructure eternal. 
- The design load: HL93 live load, load lane 9,3N / mm, load 
the importance of 3x10-3 Mpa. - Bridge width: 7+ (0.5 + 1) x2 = 10m 
- Structural rhythms including 03 rhythms (24,54+ 33 + 24.54) m 
- Reinforced concrete pile river by tensioning. 
- Chiei including the path length: 201.92 m

Capital investment : World Bank

Management Agency Department of Transport Dong Thap

Total capital investment :
- 60,9 billion VND
 
Consultant Scope : supervision

Year : 2011 - 2012
 