Name of project : Project WB5
Number : 01
Building location : Hong Ngu district - Dong Thap Province
Mission :
Scope of works : - Bridge Superstructure eternal. - The design load: HL93 live load, load lane 9,3N / mm, load the importance of 3x10-3 Mpa. - Bridge width: 7+ (0.5 + 1) x2 = 10m - Structural rhythms including 03 rhythms (24,54+ 33 + 24.54) m - Reinforced concrete pile river by tensioning. - Chiei including the path length: 201.92 m
Capital investment : World Bank
Management Agency : Department of Transport Dong Thap
Total capital investment : - 60,9 billion VND Consultant Scope : supervision
Year : 2011 - 2012
|