Name of project Resettlement areas Tay Do urban culture

Number 05

Building location County Cai Rang - Can Tho

Mission : create stable housing for people

Scope of works 
- Works III 
- The area of ​​45 hectares land use 
- 43ha area of ​​land for construction 
* Leveling: 43ha area 
* Road - trees, power supply - 
Lighting, water supply and drainage 
- Download 12T axle design 
- Hot Asphalt Pavement 
- Total length: 5.890m 
* Bridge Traffic - embankment 
- The design load for HL93 
- Global Breadth: 45m 
- The length range needs: 260m 
- Reinforced concrete embankment: 850m 
- Embankment building stone: 1.688m

Capital investment :  State Budget

Management Agency : Project Management Board to implement safety culture Tay Do

Total capital investment :
- 356 billion VND , 823 million VND
Consulting Contract value : 443 million VND
 
Consultant Scope : Survey - Design

Year : 2007
 
OTHER PROJECTS
Nguyen Van Cu Street Extended
Vo Van Hoai - Long Xuyen City
Street 9 - Chau Phu District
Tran Quang Dieu - Long Xuyen City
Vang Vong Dong rope bridge
Cu Lao bridge construction over Bach Dang
Page 1/2  1 2 
  Copyright © 2005 by Adico. All rights reserved.  
zkiwi demo