WEBLINK
HOT NEWS
Iso training
Office subculture.
Online: 224
Visitor: 405066
 
Irrigation design
Embankment Ben Tre
Name of project : Embankment Ben Tre

Number : 05

Building location : Ben Tre City

Mission : River bank protection area city of Ben Tre.

Scope of works
- Level of building : Level III.
- Embankments Length: 3.839 m.
- High embankment crest +2.5.
- Structural concrete embankment wall of the corner. Foot embankment reinforced with stone carpe.
- The technical infrastructure embankments include: transportation system, drainage, pavement on embankment, lighting and decoration.

Capital investment : The state budget.

Management Agency : DARD Ben Tre.

Total capital investment :
- 189.570.770.000 VND
- Consulting Contract value: 2.768.136.000 VND.
 
Consultant Scope : Survey design. 

Year : 2011
 
OTHER PROJECTS
Hau river bank revetment - Long Xuyen city
Embankment Thot Not
Flow regulation to limit the Hau river erosion.
Embankment O Mon
Embankments area to protect Cu Lao Minh Hospitals
Page 1/1
  Copyright © 2005 by Adico. All rights reserved.  
zkiwi demo